Sewer

Authority Board Members:

  • Robert E. Edwards, Chairman
  • Alison J Shuler, Vice Chairman
  • Lloyd W. Bucher, Secretary
  • Richard F. Schin, Treasurer
  • Timothy J. Johnson, Assistant Treasurer

 

Manager/Engineer: Brian P. Kauffman, PE

Superintendent/Assistant Manager: James R. Chubb

Facilities Information:

  • Authority sewer collection system in Lower Allen and Shiremanstown consists of over 100 miles of pipe ranging in size from 8 to 48-inches, 2,500 manholes, three metering chambers, and eight pump stations.
  • Treatment plant uses a biological nutrient removal activated sludge process with chemical phosphorus removal and ultra violet disinfection to treat a design average flow of 7.5 MGD and 24 MGD peak flow. Additionally, 500 dry tons of Class A exceptional quality biosolids are produced by autothermal thermophilic aerobic digestion and recycled.